top of page

RECENT PROJECTS - PROBLEMS & SOLUTIONS

ASPHALT MILL & OVERLAY

ISSUE - Severe cracking in parking lot

 

SOLUTION - Mill the top layer of asphalt (2 inches) and haul debris away from job site.  Pave 2 inches of asphalt and compact to proper density.  Re-stripe stripe parking lot to existing markings.

Lowes Distribution Center, Frostproof, FL

VILLAGE PARK ROAD ASPHALT OVERLAY

ISSUE - Severe cracking and damage throughout asphalt drive lane

SOLUTION - Repair subgrade base and pave 1 inch asphalt overlay.

Park Village Access Lane, Largo, FL

RETENTION FLUME RECONSTRUCTION

ISSUE – Severe cracking in concrete

 

SOLUTION – Full demo of existing concrete flume.  Add leveling to repair base.  Form and pour 4000 psi concrete with fiber mesh, broomed to smooth finish.

Lowe's Distribution Facility, Kissimmee, FL

DRAINAGE ISSUES

ISSUE – Drainage Problems

 

SOLUTION – Professional scope the grade of the drive lane to identify why water was not draining properly.  Lower asphalt in some areas and provided an asphalt overlay to successfully allow the flow of the water to drain to the storm drains.

Bickley RV Park, Seminole, FL

TREE ROOT
DAMAGE

ISSUE – Tree Root Pavement Damage

 

SOLUTION – Remove asphalt and roots, repair base and pave new asphalt

Willow Brooke Apartments, Lakeland, FL

bottom of page